J-0004 Scheduled
Approved by Chris Bell Nov 25 at 9:15 AM
When and where
| Date | Saturday, November 28, 2026 |
| On site at | 08:00 |
| Site | 45 Mill Creek Rd, Greenbrier, TN 37073 |
| Site contact | Ray Dalton · (615) 555-0366 |
| Minimum | 4 hours |
Crew
| Crew | Crew A · Repairs and cleanings · 3 people |
| Also going | T-3 · Ram 2500 crew truck TR-1 · Big Tex dump trailer, 14 ft |
Crew
- Renee Walsh · Crew lead · (615) 555-0113
- Ana Ruiz · Installer · (615) 555-0122
Tickets and alerts
| Sat Nov 28 | Not started |
Pre-shift check today: Passed 7:50 AM by Renee Walsh · Crew A's history
Documents for the site
Send documentsEmail the crew's inspection record, insurance, and more to the site contact.
Site survey
Do the site surveyNo site survey yet. Walk the site on a phone: power lines, slope, access, where the ladders and dumpster go, and traffic.
No permits on this job. Add building permits and street or sidewalk closures (a dumpster or a lift in the street) here so the office sees their dates.
Customer insurance: no certificate on file. See certificates
Weather
No site location yet. Put the crew on the site plan or add the location on a site survey.
Checked Nov 28, 10:26 PM.
Crew time
30 h 56 min loggedStart travel when you leave the yard, work when you get to the site, and stop when you're done. Travel is paid at its own rate.
On the clock now
Start the clock for someone on the crew
2 time entries
- Renee Walsh Travel 35 minSat Nov 28, 7:10 AM to 7:45 AM
Fix this entry
- Ana Ruiz Travel 35 minSat Nov 28, 7:10 AM to 7:45 AM
Fix this entry
Per diem is off. Set the amount under Settings.
Prevailing wage
Mark as prevailing wageFor Davis-Bacon, state prevailing wage, or union jobs: add the wage determination and each worker's classification, then print the weekly certified payroll.
Measurements and insurance
- 1802 House · 80 ft of gutter
Volunteer Mutual · VM-2611-40817 · Supplement sent · $4,580.00 still to come from the carrier
Quote and invoice
No quote yet.